Water Measures at BLCP Power Plant
BLCP Power Plant has given importance to efficient water management by installing desalination reverse osmosis system with 4000 cubic meter per day capacity which could replace the entire amount of primary raw water required by the power plant during drought crisis.
In addition, the power plant has initiated the project to reuse treated water in production process and domestic usage e.g. plant watering at the average amount of 474,135 cubic meter per year in order to promote water resource conservation.
Reuse of Water at Quezon Power Plant
Quezon Power Plant has clearly shown its intention to manage water resources within the facility to its full potential by reusing treated water for the following purposes.
- Use of 5,151.16 cubic meter of treated water from clarifier basin for producing water for domestic use at reverse osmosis unit to replace primary raw water during start up process of the power plant.
- Use of 36,198.09 cubic meter of treated water at spray dryer absorber to reduce gas temperature before entering electrostatic precipitator.
- Use of 36,198.09 cubic meter of treated water at spray dryer absorber to reduce gas temperature before entering electrostatic precipitator.
It could reduce
consumption in 2021 and avoid the emission of
9.46 MtonCO2e of greenhouse gases.
Water Reuse at San Buenaventura Power Plant (SBPL)
SBPL Power Plant is committed to manage its water resources within the plant to its full potential by reusing treated water for the following purposes.
- Use of 138.84 cubic meter of treated water from clarifier basin in condenser cleaning.
- Use of 17,965 cubic meter of treated water from treated effluent pond (TEP) to spray on ash pile to reduce dust dispersion.
- Use of 1,607.31 cubic meter of treated water to spray on the road to reduce dust.
Overall, in 2021, SBPL Power Plant reduced
19,711.15 cubic meter of water consumption
and avoid the emission of
4.08 MtonCO2e of greenhouse gases.